Justin DuBois
DSM Wiseman
- 3,326
- 3,297
- Aug 15, 2019
-
Oakland,
California
Greetings Racers
I am having trouble getting datalog exports from ECMLink to work with RaceRender. I can't quite figure out how to get the time scale correct. The log attached is only about 25-30 seconds long. I think this (circled in red) is the thing I need to set correctly for ECM Link logs. When it imports into RaceRender - the default length it thinks is 9+min long.
Here in the project view, with 600000 units per second on the time code column, I can align one shift point, but moving forward in time, the second shift point is late on the gauge.
I am having trouble getting datalog exports from ECMLink to work with RaceRender. I can't quite figure out how to get the time scale correct. The log attached is only about 25-30 seconds long. I think this (circled in red) is the thing I need to set correctly for ECM Link logs. When it imports into RaceRender - the default length it thinks is 9+min long.
You must be logged in to view this image or video.
Here in the project view, with 600000 units per second on the time code column, I can align one shift point, but moving forward in time, the second shift point is late on the gauge.
You must be logged in to view this image or video.
Attachments
You must be registered for see attachments list
Last edited: