staticbrainwash
15+ Year Contributor
- 1,682
- 13
- Oct 10, 2004
-
Midland,
Michigan
Alright, i've been searching a lot on this and i can't seem to find exactly what people were doing to route this way.
I know it's not as effective or anything, but i'm still on a 14b. And i can't go shorter because my core is so damn long. But this is all for a diy fmic project. The total so far without welding is 320 bucks!
Anyway, the cold side routing to the uicp (dejon) is pretty self explanatory. I need pics or diagrams or instructions on how people maneuvered around the crossmember/toe hook/body for the hot side.
I don't necessarily have a problem cutting anything, but i'd prefer not to for times sake.
But yeah, i'd really appreciate anyone who diy'd this way to come and tell me how it went down!
I know it's not as effective or anything, but i'm still on a 14b. And i can't go shorter because my core is so damn long. But this is all for a diy fmic project. The total so far without welding is 320 bucks!
Anyway, the cold side routing to the uicp (dejon) is pretty self explanatory. I need pics or diagrams or instructions on how people maneuvered around the crossmember/toe hook/body for the hot side.
I don't necessarily have a problem cutting anything, but i'd prefer not to for times sake.
But yeah, i'd really appreciate anyone who diy'd this way to come and tell me how it went down!