Afizzle
Proven Member
- 348
- 1
- Jan 16, 2013
-
Dallas,
Texas
Looking to put my ARP head studs in tomorrow to raise the boost. I will be keeping the head on and going through the VC. I know the sequence and tq specs but I read something about 7 bolts needing to be tapped before te arps will fit?
Just wondering what all I should know before I start. I've tried searching it can't find anything for my particular situation.
To my knowledge, take one out at a time starting from either middle or sides and do 1 at a time torquing to final tq on the first tq after installing into the block.
Wh t am I forgetting?
Just wondering what all I should know before I start. I've tried searching it can't find anything for my particular situation.
To my knowledge, take one out at a time starting from either middle or sides and do 1 at a time torquing to final tq on the first tq after installing into the block.
Wh t am I forgetting?
