Atuca
Supporting Member
- 1,145
- 303
- Jan 6, 2007
-
Central Valley,
California
Well sooner than expected, the engine has been machined!!!
Rob's Machine Shop out in Hayward California pulled a fast one for me, having the block done in a little over 5 days. (two of which were weekend) Very satified with their work.
My crank only needed a polish, which was nice!
Block and head were both decked for the Cometic HG.
Had it line honed with the girdle, bored with a torque plate, and the flux core prove everything was in working order! Even the head's valves were all seated properly already! I will lap them for good measure because I'm putting new springs in anyways, but this is all great great news!
Now for the part of this build I been waiting for about a year for....
THE ENGINE BUILD!!!
Details and pics soon....
Rob's Machine Shop out in Hayward California pulled a fast one for me, having the block done in a little over 5 days. (two of which were weekend) Very satified with their work.
My crank only needed a polish, which was nice!
Block and head were both decked for the Cometic HG.
Had it line honed with the girdle, bored with a torque plate, and the flux core prove everything was in working order! Even the head's valves were all seated properly already! I will lap them for good measure because I'm putting new springs in anyways, but this is all great great news!
Now for the part of this build I been waiting for about a year for....
THE ENGINE BUILD!!!
Details and pics soon....