- Thread starter
- #26
MarsaGSX
20+ Year Contributor
- 487
- 29
- Feb 15, 2004
-
Czech republic,,
Europe
hey ..next pics of my project
we taked out last 4elbows with center with turbo flange...because of big problem with LAST WELD
next how looks inside of center section/turbo flange inlet.
And welds inside of tubes
we taked out last 4elbows with center with turbo flange...because of big problem with LAST WELD
next how looks inside of center section/turbo flange inlet.
And welds inside of tubes
Attachments
You must be registered for see attachments list
(1G TB and 3" muffler ) and will finished my setup
this stuf should go 10days..but wanna start my engine now!
need to wait for my comp. cover-welding 90degree elbow on it to run FMIC. then install my charger with manis,tap OIl lines..and run

And if you wanna make SS..its maybe 2times difficult than mild steel...
Damn..wasn´t really funny...milion times checking..trying to match each of elbows to make BEST radius after weld..without stairs..know I mean..
Iam boring of this..How can fix that charger..??..need to get new rebuild kit..or,I had my turbo on pieces and bearings looks not wel..but why that thing leaks?