Araesk
Proven Member
- 188
- 1
- Jul 10, 2013
-
Muskego,
Wisconsin
I'm looking into buying some 1/4'' sheet metal to weld onto the holes in my strut towers as many people have. I am not positive as to which type of metal I should buy, seeing as I want to not be worried about possibly weakening them anymore.

. But >16G is good enough? I was thinking down to like 11g would be necessary.
I am so glad I live in the south. That picture looks kind of like a tumor grew by the tower. But The welds are flush and it is doing what it needed to do.