RGdsmNewb
15+ Year Contributor
- 223
- 0
- Feb 19, 2006
-
Edmonton,
Alberta_Canada
Hi,
my T-25 is shot and i have a 14b in the mail which should be arriving fairly soon... i was planning on installing it myself with a friend outside, but we just received a mad amount of snow here and it's goin to be -10 (stupid canada) outside for the next week. So i was thinking of getting a shop to do the install and was wondering how long it should take them... labour is like 60 bucks an hour
this is with the install kit from turbochargers.com
my T-25 is shot and i have a 14b in the mail which should be arriving fairly soon... i was planning on installing it myself with a friend outside, but we just received a mad amount of snow here and it's goin to be -10 (stupid canada) outside for the next week. So i was thinking of getting a shop to do the install and was wondering how long it should take them... labour is like 60 bucks an hour
this is with the install kit from turbochargers.com