Slow91Laser
10+ Year Contributor
- 233
- 1
- Oct 28, 2010
-
Orlando,
Florida
Alright guys im a little lost here, im looking to upgrade my fuel setup (-6 ss line from tank to rail/inline 255/fpr/fuel lab filter/1450's)......
I have already ordered 10ft of -6 line and some fitting's but im having a problem trying to figure out what fittings i would need to make it work from the tank side....
See pic.....
Can anybody school me on how to make this all work? I was thinking i could find a fitting to replace the rubber hose section with and just run the line from there but im not sure!
Thanks!
I have already ordered 10ft of -6 line and some fitting's but im having a problem trying to figure out what fittings i would need to make it work from the tank side....
See pic.....
You must be logged in to view this image or video.
Can anybody school me on how to make this all work? I was thinking i could find a fitting to replace the rubber hose section with and just run the line from there but im not sure!
Thanks!
Attachments
You must be registered for see attachments list
Last edited: