Welcome to DSMtuners - The Talon, Laser, and Eclipse performance enthusiast resource
























Login


 Featured 
 Products 
 >>>>>> 
Go Back   DSMtuners > DSM Forums > General > Tech Article Archives > Articles: 420A-specific

Add to this Article  
 
LinkBack Thread Tools
Old 05-25-2007, 10:54 AM   #1 (permalink)
Proven Member
 
Project2G's Avatar
 
From: Denver, Colorado
Region: Rocky Mountain
Registered: Aug 2003
Posts: 344
Classifieds Rating: (58)
Reputation: Project2G is more helpful than not
Timing Belt Replacement



REMOVAL SERVICE POINTS


1.Remove crankshaft pulley.
2.Follow removal procedure outlined in illustration, noting the following.
NOTE: Place the removed power steering oil pump in a place where it will not be a hindrance when removing and installing the timing belt, and tie it with a cord.

3.Remove the power steering oil pump from the bracket with the hose attached.
4.Place a garage jack against the engine oil pan with a piece of wood in between, jack up the engine so that the weight of the engine is no longer being applied to the engine mount bracket, and then remove the engine mount bracket. CAUTION: Do not rotate the camshaft or crankshaft after removing the timing belt, or valve components may be damaged. Always align timing marks before removing timing belt.



5.Align timing marks. Loosen the timing belt tensioner to remove timing belt.
6.When the tensioner is removed from the engine, it is necessary to compress the plunger into the tensioner body.

NOTE: Index the tensioner in the vise the same way it is installed on the engine. This is to ensure proper pin orientation when the tensioner is installed on the engine.



7.Place the tensioner into a vise and slowly compress the plunger.
8.When the plunger is compressed into the tensioner body, install a pin through the body and plunger to retain plunger in place until tensioner is installed.

CAUTION: Camshaft or crankshaft should not be rotated after timing belt is removed. Damage to valve components may occur. Always align timing marks before removing timing belt.




1.Remove crankshaft damper bolt. Remove damper using Special Tool MB995055 and insert MB995057 or equivalent.



2.Remove engine mount bracket.



3.Remove front half of timing belt cover.



4.Align timing marks. Loosen timing belt tensioner screws and remove timing belt.
5.Remove tensioner pulley.
6.Remove timing belt tensioner.
7.Remove tensioner arm bracket.
8.Remove idler pulley.
9.When tensioner is removed from the engine, it is necessary to compress the plunger into the tensioner body.



10.Place the tensioner into a vise and slowly compress the plunger.
CAUTION: Index the tensioner in the vise the same way ft is installed on the engine. This is to ensure proper pin orientation when tensioner is installed on the engine.



11.When plunger is compressed into the tensioner body, install a pin through the body and plunger to retain plunger in place until tensioner is installed.



12.Hold camshaft sprocket with Special Tools MB990767 and MD998719 while removing bolt.
13.Remove support bracket.



____________________________
-Steve-
97 GST TD06 20G

Last edited by Project2G : 10-21-2008 at 12:41 PM. Reason: Updated Pictures
Offline  

[webpage] [posts] [gallery] Reply With Quote
Related 420A Auctions

Sponsored Links
Old 05-25-2007, 10:55 AM   #2 (permalink)
Proven Member
 
Project2G's Avatar
 
From: Denver, Colorado
Region: Rocky Mountain
Registered: Aug 2003
Posts: 344
Classifieds Rating: (58)
Reputation: Project2G is more helpful than not
14.Remove rear timing belt cover fasteners. Remove cover.



15.Remove camshaft seal.

INSTALLATION SERVICE POINTS


1.Follow removal procedure in reverse order noting the following.



2.Set the crankshaft sprocket to TDC by aligning the sprocket with the arrow on the oil pump housing.
3.Set the camshafts timing marks together by aligning notches on sprockets.
4.Move the crankshaft to 1/2 notch before TDC.



5.Install the timing belt. Starting at the crankshaft, go around the water pump sprocket, idler pulley, camshaft sprockets and then around the tensioner pulley.
6.Move the crankshaft sprocket to TDC to take up belt slack. Install the tensioner to block but do not tighter, fasteners.



7.Using a torque wrench on the tensioner pulley, apply 28 Nm (21 ft.lbs.) of torque to tensioner.
8.With torque being applied to the tensioner pulley, move the tensioner up against the tensioner pulley bracket and tighten fasteners to 31 Nm (23 ft. lbs.) .
9.Pull the tensioner plunger pin. Pretension is correct when the pin can be removed and installed.
10.Rotate the crankshaft 2 revolutions and check the alignment of the timing marks. If marks are not aligned correctly, do it again.



1.Install camshaft seal into cylinder head using Special Tool MD998713 until flush with the head.
NOTE: Shaft seal lip surface must be free of varnish, dirt or nicks. Polish with 400 grit paper if necessary.




2.Install rear timing belt cover. Tighten fasteners to 9.6 Nm (6.9 ft.lbs.).
3.Install support bracket.



4.all camshaft sprockets and tighten attaching bolts to 101 Nm (73 ft.lbs.).
5.Install idler pulley.
6.Install tensioner arm bracket.
7.Install timing belt tensioner.
8.Install tensioner pulley.



9.Set crankshaft sprocket to Top Dead Center (TDC) by aligning the sprocket with the arrow on the oil pump housing.



10.Set camshafts timing marks together by aligning notches on sprockets.
11.Move crankshaft to 1/2 notch before TDC.
12.Install timing belt. Starting at the crankshaft, go around the water pump sprocket, idler pulley, camshaft sprockets and then around the tensioner pulley.
13.Move crankshaft sprocket to TDC to take up belt slack. Install tensioner to block but do not tighten fasteners.



____________________________
-Steve-
97 GST TD06 20G

Last edited by Project2G : 10-21-2008 at 01:14 PM. Reason: Updated Pictures
Offline  

[webpage] [posts] [gallery] Reply With Quote
Old 05-25-2007, 10:55 AM   #3 (permalink)
Proven Member
 
Project2G's Avatar
 
From: Denver, Colorado
Region: Rocky Mountain
Registered: Aug 2003
Posts: 344
Classifieds Rating: (58)
Reputation: Project2G is more helpful than not
14.Using a torque wrench on the tensioner pulley, apply 28 Nm (20 ft.lbs.) of torque to tensioner.
15.With torque being applied to the tensioner pulley move the tensioner up against the tensioner pulley bracket and tighten fasteners to 31 Nm (22 ft.lbs.).
16.Pull tensioner plunger pin. Pretension is correct when pin can be removed and installed.




17.Rotate crankshaft 2 revolutions and check the alignment of the timing marks.



18.Install front timing belt cover.



19.Valve Timing Check; (timing belt cover installed), remove the inspection cover on timing belt cover. With number one cylinder at TDC, the timing marks on the camshaft sprocket should be aligned together. If marks are not aligned correctly, perform procedure again.



20.Install engine mount bracket. Tighten bolts to 41 Nm (30 ft.lbs.).



21.Install crankshaft damper using MB995035. Using Special Tools MB990767 and MD998719 to hold damper, tighten crankshaft bolt to 62 Nm (45 ft.lbs.).


____________________________
-Steve-
97 GST TD06 20G

Last edited by Project2G : 10-21-2008 at 01:15 PM. Reason: Updated Pictures
Offline  

[webpage] [posts] [gallery] Reply With Quote
Add to this Article






Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT -7. The time now is 07:10 AM.

Page generated in 0.19379497 seconds (77.97% PHP - 22.03% MySQL) with 9 queries
DSM Forums | Pontiac Solstice/Saturn Sky Forums | Evolution Forums | WRX Forums

© 2001-2008 SPEEDtuners Network, LLC All Rights Reserved

LinkBacks Enabled by vBSEO 3.1.0