- Thread starter
- #26
Silverspyder
20+ Year Contributor
- 267
- 482
- Nov 18, 2002
-
Lakeville,
Minnesota
Finally decided to get off my ass and put some of my other house projects on hold to get this subframe assembled. First thing...get everything laid out.
Control arms and trailing arms installed. Lubing up the joints. Using Joe Gibb's EPC.
All assembled with all new parts and hardware where I could.
Swaybar connections
Next up, get it under the car, install axles and rear brakes and get her back on the ground.
Control arms and trailing arms installed. Lubing up the joints. Using Joe Gibb's EPC.
All assembled with all new parts and hardware where I could.
Swaybar connections
Next up, get it under the car, install axles and rear brakes and get her back on the ground.