- Thread starter
- #526
Justin DuBois
Proven Member
- 1,748
- 1,488
- Aug 15, 2019
-
Oakland,
California
Extra effort this week. John is going to do his best to get me out the door so I can drive home on the weekend.
Ported 2G-o2 is out, E3-o2 is going in! Finally, the E3 turbine is going to match up to the E3-o2 housing. Ever since I rebuilt the 16G - removing the cracked 2G turbine, the miss match housing (not visable externally) has been bugging me. This way is the right way.
Too thin DP gasket
The correct E3 Turbine/O2 gasket:
Ported 2G-o2 is out, E3-o2 is going in! Finally, the E3 turbine is going to match up to the E3-o2 housing. Ever since I rebuilt the 16G - removing the cracked 2G turbine, the miss match housing (not visable externally) has been bugging me. This way is the right way.
Too thin DP gasket
The correct E3 Turbine/O2 gasket: