bwhite
20+ Year Contributor
- 1,039
- 2
- Mar 5, 2002
-
Brook Park,
Ohio
Ive changed my shift forks and wanted to set shaft preloads. I used the fsm and it says to use .06 solder which I got and measured with but the center diff and the input shaft are not crushing the solder at all. Should I just use the larger 3/32 solder and remeasure? The intermediate shaft shim is. 038 and the solder measurement came up with .042. Does that mean I need a .012 thicker shim to get my .008 of preload?