angelogts09
Probationary Member
- 26
- 0
- Mar 28, 2015
-
Las Cruces,
New_Mexico
My 95 tsi engine bay. It is 50% done which was fmic with piping, new valve cover and intake. Next will be Emissions and Cruise control delete, spark plug cover, oil catch can, turbo mani, aluminium rad and cool
You must be logged in to view this image or video.
ant overflow tank. All you guys bays looking real nice.