No question here just got motor anxiety. Lol
Got a call from him to ask me few questions.
Asked me how much i wanted off the block. Told him I wanted the minimum. I told him I believe the spec limit is .010" total. After researching I've come up with .008".
He tried to tell me you can take off any amount just use a thicker gasket.
I assume this would be right if it was taken off head. And in my mind the thinner the gasket the less chance for a blow out.
Told me i had a exhaust stud with a drill bit or easy out broke off(previous owner). Gonna take an hour plus cost of bit.
I then had to argue with him that one balance shaft has two bearings fed by block.
Don't understand why he called me if he "knew it all" already.
I asked for
Head:
Surface
Clean
Valve job
Install valves and springs
Block:
Align hone
.020 bore
clean
Balance
Rotation assembly
Got quoted $1100 and told me they are experienced with the motor.
Was told 1-2 weeks. Friday will be 4.
I should've done more research into exactly what i wanted instead of taking it to the nicest looking shop around assuming they know what they are doing. I just dropped off the parts with spec sheets.
You guys think I'm doomed for failure?
Lets hear your horror story.
Got a call from him to ask me few questions.
Asked me how much i wanted off the block. Told him I wanted the minimum. I told him I believe the spec limit is .010" total. After researching I've come up with .008".
He tried to tell me you can take off any amount just use a thicker gasket.
I assume this would be right if it was taken off head. And in my mind the thinner the gasket the less chance for a blow out.
Told me i had a exhaust stud with a drill bit or easy out broke off(previous owner). Gonna take an hour plus cost of bit.
I then had to argue with him that one balance shaft has two bearings fed by block.
Don't understand why he called me if he "knew it all" already.
I asked for
Head:
Surface
Clean
Valve job
Install valves and springs
Block:
Align hone
.020 bore
clean
Balance
Rotation assembly
Got quoted $1100 and told me they are experienced with the motor.
Was told 1-2 weeks. Friday will be 4.
I should've done more research into exactly what i wanted instead of taking it to the nicest looking shop around assuming they know what they are doing. I just dropped off the parts with spec sheets.
You guys think I'm doomed for failure?
Lets hear your horror story.
, the "suitcase handles" should not have been done like that, all they had to do was notch them out for clearance for the Rod.